Home page News Press Releases DTEK Ladyzhynska TPP is already preparing for the heating season
DTEK Ladyzhynska TPP is already preparing for the heating season
Thermal power generation18 August 2020
DTEK Ladyzhynska TPP is already preparing for the heating season

At Ladyzhynska TPP, a large repair campaign has begun to prepare the city’s heating network. Initially, the pipeline of the heat supply system is being upgraded to ensure stable heat supply to the houses of Ladyzhyn residents in the autumn and winter period.

Presently, Interenergoservice’s repairmen are replacing the pipeline at all emergency sections of the heating network that were discovered during hydraulic tests. More than 200 meters of pipes have already been replaced.

“The main heating network must be 100 % ready to transport hot water by the beginning of September,” Ihor Sniehin, Director of DTEK Ladyzhynska TPP, commented. “But repair work will not stop until we have the entire system fully prepared. We must do this before the cold weather begins. Heat and light in every home is not just our slogan, but our duty.”

In general, power engineers of Ladyzhynska TPP and Interenergoservice plan to repair about 450 m of the heating system before the start of the heating season. Stable supply of heat and hot water to all houses of Ladyzhyn residents depends on their high-quality and efficient work.

13 November 2024
News and announcements Year to date, DTEK Energy miners have commissioned 18 new longwall coal faces to ensure a more reliable supply of fuel to TPPs during the heating season
05 November 2024
News and announcements Year to date, DTEK Energy has invested UAH 2.6 billion in repairs and restoration of its TPPs
25 October 2024
News and announcements Since the beginning of the year, DTEK Energy's mechanical engineers have produced 760,000 spare parts and 10 new shearers to support Ukrainian coal production
15 October 2024
News and announcements DTEK Energy Fulfils All Plans To Prepare for the Heating Season
11 October 2024
News and announcements DTEK Energy Miners Put 16 New Coal Longwalls Into Operation To Ensure Consistent Fuel Supply to TPPs in Winter
10 October 2024
News and announcements Oleksandr Fomenko Is Appointed CEO of DTEK Energy
08 October 2024
News and announcements DTEK Energy Invests Over UAH 2.3 Bln in Repairs and Rehabilitation of TPPs To Ensure a More Reliable Heating Season
24 September 2024
News and announcements Year to Date, DTEK Energy’s Mechanical Engineers Have Manufactured 10 New Shearers and 683 Thousand Spare Parts To Support Ukrainian Coal Production
19 September 2024
News and announcements Power Engineers for the First Time Showed Kyiv Residents How TPP Equipment Looks After Russian Strikes
11 September 2024
News and announcements DTEK Energy Miners Put 14 New Longwalls into Operation Since the Beginning of the Year, 12 More Planned