Home page Preparation for the AWP

Preparation for the AWP

Preparation for the AWP
What Is an AWP?
The power system experiences the greatest load during the autumn-winter period (AWP) or heating season. Due to low temperatures and increased energy consumption, generating companies must operate as reliably and steadily as possible to meet the electricity demands of households, industry, and critical infrastructure. That is why, starting in February or March, all energy companies begin preparing for the next winter: producing mining equipment for stable coal production, preparing and launching coal faces, mining and storing coal for thermal power plants, and repairing thermal power plants. All of this must be done amid security risks and regular enemy attacks on energy infrastructure, which have continued throughout the full-scale war.
Key figures in 2026
COMPLETED:
3.6
UAH BILLION
invested in TPP repairs and restoration in the first 6 months of 2026
14
COAL FACES
commissioned in the first 6 months of 2026
3.6
UAH BILLION
invested in coal mining in the first 6 months of 2026
909 | 6
UNITS OF MINING EQUIPMENT | NEW ROADHEADERS
manufactured and repaired in the first 6 months of 2026
DESPITE THE WAR AND SHELLING:
240+
AIR STRIKES TARGETING TPP
(since February 2022 incl. frontline)
70+
TIMES THE POWER ENGINEERS
restored the TPP from “square one” after shelling and resumed operations
(from February 2022 to November 2026)