Home page News Press Releases DTEK Energy cuts emissions and reduces costs by using coal mine methane to produce electricity
DTEK Energy cuts emissions and reduces costs by using coal mine methane to produce electricity
Thermal power generation21 December 2021
DTEK Energy cuts emissions and reduces costs by using coal mine methane to produce electricity

DTEK Energy has processed over one million cubic meters of coal mine methane released from the Stepova mine, using cogeneration technology, to produce electricity and thermal energy for in-house consumption. These efforts helped reduce the environmental impact of the operation as well as optimise costs.

DTEK Energy launched the pilot project to generate electricity and heat using coal mine methane at the end of 2020. Since then, the gas released during coal mining has been pumped out to the surface to protect the miners, and then been converted into electricity and heat using special cogeneration equipment. This project is a combination of efforts by DTEK Energy and Recycling Solutions. 

Mykhailo Barabash, Coal Production Director, DTEK Energy, said, "At DTEK Energy, we pride ourselves on being a responsible company. We have been implementing environmental initiatives and projects to reduce our environmental impact. Methane is always released in underground mines when coal is produced. It can create a hazard to coal miners when its concentration reaches a certain threshold which is why we equip coal mines with ventilation and degasification systems. We used to release that gas into the atmosphere. But now it is burnt in a special cogeneration installation and converted into electricity. It means keep our miners safe, we have an additional source of energy to power the mine and we are making coal production more environmentally clean".

During the past year, DTEK Energy has converted 1.3 million cubic metres of coal mine methane into electricity, producing approximately 6 million kW/hours of electricity, in turn providing 10%  of the total energy consumed by the coal mine. Also, pollutant emissions have been considerably reduced.

Recycling Solutions, a strategic waste and by-product management company, invested USD 2.6 million into the project and ran it. 

Dmytro Anufriiev, the CEO of Recycling Solutions, said, "This project is a win-win. Methane emissions have a considerable global warming potential. At the same time, methane is an alternative energy source. The volume of methane we have processed at the Stepova mine is the equivalent of the pollutants produced by five thousand cars operating for a year, burning 11,200 tons of coal, or supplying heat and electricity to 2,700 homes. And it takes 11 thousand hectares of forest each year to absorb the same volume of СО2. Our installation is unique in Ukraine, marking a major step in the development of our alternative energy sector."

DTEK Energy takes a responsible attitude to the impact caused by its industrial operations on the environment and social sector, and cares about the quality of life of future generations. The company has integrated the 12 Sustainable Development Goals into its 2030ESG strategy.

 

13 November 2024
News and announcements Year to date, DTEK Energy miners have commissioned 18 new longwall coal faces to ensure a more reliable supply of fuel to TPPs during the heating season
05 November 2024
News and announcements Year to date, DTEK Energy has invested UAH 2.6 billion in repairs and restoration of its TPPs
25 October 2024
News and announcements Since the beginning of the year, DTEK Energy's mechanical engineers have produced 760,000 spare parts and 10 new shearers to support Ukrainian coal production
15 October 2024
News and announcements DTEK Energy Fulfils All Plans To Prepare for the Heating Season
11 October 2024
News and announcements DTEK Energy Miners Put 16 New Coal Longwalls Into Operation To Ensure Consistent Fuel Supply to TPPs in Winter
10 October 2024
News and announcements Oleksandr Fomenko Is Appointed CEO of DTEK Energy
08 October 2024
News and announcements DTEK Energy Invests Over UAH 2.3 Bln in Repairs and Rehabilitation of TPPs To Ensure a More Reliable Heating Season
24 September 2024
News and announcements Year to Date, DTEK Energy’s Mechanical Engineers Have Manufactured 10 New Shearers and 683 Thousand Spare Parts To Support Ukrainian Coal Production
19 September 2024
News and announcements Power Engineers for the First Time Showed Kyiv Residents How TPP Equipment Looks After Russian Strikes
11 September 2024
News and announcements DTEK Energy Miners Put 14 New Longwalls into Operation Since the Beginning of the Year, 12 More Planned