Press Releases
16/01
In 2024, DTEK Energy’s Power Engineers Rebuilt TPPs From Scratch More Than 20 Times After Massive Shelling
15/01
In 2024, DTEK Energy Invested About UAH 11 Billion in the Rehabilitation of TPPs and Operation of the Mines
08/01
504 DTEK Energy Power Engineers Received Awards on the Occasion of Their Professional Holiday
27/12
DTEK Energy’s Mechanical Engineers Manufactured 11 New Shearers and 916 Thousand Spare Parts for Stable Operation of Ukrainian Mines
25/12
A Power Engineer Killed in a Massive Shelling of DTEK Energy’s TPP
25/12
russia Attacks DTEK Energy’s Thermal Power Plant, Equipment Severely Damaged
13/12
russia Has Launched a Massive Attack on DTEK Energy’s TPPs, Damaging the Equipment
11/12
Over 11 Months of This Year, DTEK Energy Invested UAH 2.8 Billion in Restoring Its TPPs After Shelling
22/11
DTEK Energy's mechanical engineers produced 831,000 spare parts and 11 new shearers to support Ukrainian coal production
20/11
The first in the Ukrainian industry: DTEK introduces a programme to support employees' mental health using VR technologies
17/11
russia shelled DTEK Energy's thermal power plants, seriously damaging the equipment
13/11
Year to date, DTEK Energy miners have commissioned 18 new longwall coal faces to ensure a more reliable supply of fuel to TPPs during the heating season