some-alt
Home page News Press Releases UAH 721M of Investment Allowed Miners of DTEK Geroiv Kosmosu to Produce 4.9M Tonnes of Coal in 2017
UAH 721M of Investment Allowed Miners of DTEK Geroiv Kosmosu to Produce 4.9M Tonnes of Coal in 2017
Thermal power generation10 January 2018
Geroiv Kosmosu Mine Group has produced 4.9M tonnes of coal in 2017, that’s 200K tonnes more than the annual target. The coal mined by this Mine Group is supplied to national TPPs and allows to provide the population of four Ukrainian regions with light and heat (Zaporizhzhia, Ivano-Frankivsk, Vinnytsia, Lviv).
UAH 721M of Investment Allowed Miners of DTEK Geroiv Kosmosu to Produce 4.9M Tonnes of Coal in 2017

The record volume of coal has been mined thanks to the collective’s professionalism and consistent DTEK investments in developing and maintaining the capacities of both mines of the Mine Group. UAH 721M have been invested into Blagodatna Mine and Geroiv Kosmosu Mine in 2017.  The investments targeted the purchase and repair of cleaning equipment, capital mine workings, the underground transport chain operation, the repair of tunneling equipment, ventilation and degassing.

Geroiv Kosmosu Mine has launched 9 faces in 2017. On average, the Mine Group has been producing 13.7K tonnes of coal per day.

Sasun Mkrtchyan, Director of DTEK Geroiv Kosmosu Mine Group:

“The Mine Group operates and develops steadily, ensuring that the enterprise keeps providing jobs to the population of the region, miners receive wages on time, the Western Donbas develops, and the thermal power sector is supplied with fuel for electric power generation in the coming decades. We have almost reached the annual production mark of 5M tonnes  of coal, while understanding that there is more at stake than just coal. Our work today is a foundation for the survival and further development of our country.”      

The miners plan to commission 7 faces and produce about 4.8M tonnes of “black gold” in 2018.

08 April 2026
News and announcements Svyatoslav Vakarchuk performs for DTEK power engineers at destroyed power plant after Ukraine’s hardest winter
12 March 2026
News and announcements DTEK Energy’s Mechanical Engineers Have Manufactured One Roadheader and Over 270,000 Spare Parts for Mines
09 March 2026
News and announcements DTEK Energy Presents an Inclusive Environment at the Surface Facility of the Mine to Natalia Kalmykova, Minister for Veterans’ Affairs
06 March 2026
News and announcements A Miner From DTEK Energy Has Returned Home From russian Captivity
05 March 2026
News and announcements Serhii Kriuchko, an Employee of DTEK Energy’s TPP, Receives a State Award – the Honorary Title of “Honoured Energy Worker of Ukraine”
27 February 2026
News and announcements Four Power Engineers from DTEK Energy’s TPPs Received State Awards for Their Extraordinary Efforts During the Harshest Winter
25 February 2026
News and announcements In 2025, DTEK Energy Allocated UAH 16 Billion To Support Thermal Power Generation and Coal Mining During the 2025/2026 Heating Season
12 February 2026
News and announcements DTEK Energy’s Mechanical Engineers Manufactured Over 160,000 Spare Parts for Mines in January
12 February 2026
News and announcements Since the Beginning of February, the Enemy Has Shelled DTEK Energy TPPs for the Third Time
07 February 2026
News and announcements russia Has Launched Its Tenth Massive Attack on DTEK Energy TPPs in Various Regions Since October