Home page News Press Releases Pavlogradska CCM Will Be Saving 70% of Electricity for Lighting with LED
Pavlogradska CCM Will Be Saving 70% of Electricity for Lighting with LED
The energy-efficient project at DTEK Pavlogradska Central Concentrating Mill will allow the enterprise to save 70% of energy used for lighting. According to the project, DTEK ESCO has completely funded and installed 650 new LED fixtures instead of old incandescent and fluorescent lamps and replaced 6 km of cabling – all this on the turnkey basis.
Pavlogradska CCM Will Be Saving 70% of Electricity for Lighting with LED

Andrii Fedorov, Director of DTEK Pavlogradska CCM:

“This retrofitting will allow us to save 1.1 million kWh, or 1.8 million hryvnias, on electric lighting. There will be no more dark places left in the mill’s main building. The illuminance levels will increase threefold. And owing to LED fixtures longevity, they are not going to need replacement for several years.”

The enterprise employees have already appraised the new electric lighting from practical side.

Svitlana Rudchykova, Crane Machinist, DTEK Pavlogradska CCM:

“I work every other night shift, and for me as a crane machinist good and quality lighting is crucial. It has become considerably easier and more pleasant to work after installation of the lights. There’s another benefit that this lighting doesn’t strain the eyes. You can see everything like during the day, and your eyes rest. That’s a great improvement. It has been helping me in my professional operation much ever since.”

Inna Kononova, Coal Processing Operator, DTEK Pavlogradska CCM:

“I’ve been working at the mill for 17 years. Night shifts are frequent. You can imagine that in the shops where many various mechanisms operate lighting cannot be underestimated. Now, we can see everything at night like it’s day. And the territory is like a goldfish bowl now. In my opinion, first of all, this retrofitting will allow us to keep injury events even less frequent.”

Ihor Tirunov, Chief Process Engineer of DTEK Pavlogradska CCM:

“We initiated this project last year while we were training in energy efficiency in industry at DTEK ESCO. Doing our ‘homework’ – the independent energy audit of the enterprise – we realized that a formidable economy can be achieved from simple replacement of lighting. And the experience of our colleagues at DTEK Dobropilska CEP, where they have already had two similar projects implemented, has inspired us even more. DTEK ESCO has funded the energy-efficient project development at 100%, involved Ukrainian contractors and equipment manufacturers and guarantees the achievement of electric energy economy. We are happy with the results of this project.”

Yevhen Bushma, Director of DTEK ESCO:

“Pavlogradska CCM puts much effort into energy efficiency improvement through production automation and innovations. We assist in achievement of several energy efficiency goals at this enterprise: retrofitting of the electric lighting system, planning of thermal improvement of the administrative and amenities complex, and retrofitting of the pump and conveyor equipment. All projects are fulfilled based on energy service contracts. That means, we fund and execute the projects on the turnkey basis, guarantee the achievement of energy resources saving, and then we split the savings with our client. After the contract expires, all the equipment is kept by the client. It is possible to improve public sector facilities and multi-apartment residential buildings in Pavlohrad and Dnipropetrovsk Region in general as well in a similar fashion.”

It should be recalled that DTEK ESCO has already completed two projects on retrofitting of electric lighting of the main building and the conveyor galleries section at DTEK Dobropilska CEP. Four hundred and seventy fire-safe LED fixtures from Ukrainian manufacturer IntelTech Ukraine LLC have been installed there. The electric lighting savings have reached 85 to 90%.

13 November 2024
News and announcements Year to date, DTEK Energy miners have commissioned 18 new longwall coal faces to ensure a more reliable supply of fuel to TPPs during the heating season
05 November 2024
News and announcements Year to date, DTEK Energy has invested UAH 2.6 billion in repairs and restoration of its TPPs
25 October 2024
News and announcements Since the beginning of the year, DTEK Energy's mechanical engineers have produced 760,000 spare parts and 10 new shearers to support Ukrainian coal production
15 October 2024
News and announcements DTEK Energy Fulfils All Plans To Prepare for the Heating Season
11 October 2024
News and announcements DTEK Energy Miners Put 16 New Coal Longwalls Into Operation To Ensure Consistent Fuel Supply to TPPs in Winter
10 October 2024
News and announcements Oleksandr Fomenko Is Appointed CEO of DTEK Energy
08 October 2024
News and announcements DTEK Energy Invests Over UAH 2.3 Bln in Repairs and Rehabilitation of TPPs To Ensure a More Reliable Heating Season
24 September 2024
News and announcements Year to Date, DTEK Energy’s Mechanical Engineers Have Manufactured 10 New Shearers and 683 Thousand Spare Parts To Support Ukrainian Coal Production
19 September 2024
News and announcements Power Engineers for the First Time Showed Kyiv Residents How TPP Equipment Looks After Russian Strikes
11 September 2024
News and announcements DTEK Energy Miners Put 14 New Longwalls into Operation Since the Beginning of the Year, 12 More Planned