Press Releases

20/02
DTEK Energy’s Machine Builders Produce First Two Combines and 70,000 Spare Parts of the Year to Maintain Reliable Operation of Ukrainian Mines

16/02
DTEK Energy’s Frontline TPP Faces Second russian Attack in 24 Hours

16/02
The enemy made another attack on DTEK Energy's frontline TPP

14/02
DTEK Energy repaired another power unit damaged by massive shelling last winter

12/02
One of DTEK Energy's TPPs stopped generating electricity as a result of hostile shelling

12/02
DTEK Energy has increased the volume of imported coal contracted for the heating season to 400,000 tonnes

08/02
In January, DTEK Energy put 2 new longwalls into operation, with 3 more planned for February

03/02
The enemy has carried out another attack on energy enterprises of DTEK Energy

02/02
In January, TPPs of DTEK Energy increased electricity output by 12% to support the Ukrainian power grid

31/01
DTEK Energy has imported 226 thousand tonnes of coal to ensure a more reliable heating season, deliveries continue

18/01
The Cabinet of Ministers of Ukraine recognized the merits of a power engineer from Ladyzhynska TPP

17/01
Ukraine has passed half of the heating season with light and heat due to the titanic work of air defense and power engineers, — the CEO of DTEK Energy